


























Ash Solid Wood Bauhaus Retractable Vanity Table.
North American ASH solid wood , ASH Collection
Beschreibung
Size
(1207-2112)*400*801mm
Material
1. The “100% solid wood” mentioned on the page refers to the wood parts excluding hardware and accessories (metal, glass and other non-wooden parts), and does not contain artificial boards or veneers.
2. The main material is imported ash wood, which is tough, elastic, and has a neat and beautiful wood grain.
3. The auxiliary material is imported New Zealand pine, which has good toughness, stable properties, light weight, straight grain and few knots, and is used for the bottom front and back horizontal and center vertical frames.
4. The auxiliary material is paulownia wood, which is corrosion-resistant, wear-resistant, high-temperature resistant, does not deform, and is not easy to mold. It has been the material for bellows rods since ancient times, and it is also a famous ancient Chinese musical instrument wood used for drawer boxes and baseboards.
5. The cabinet legs are made of 201 stainless steel with a wall thickness of 2mm.
Advantages of solid wood
Simple and natural, healthy and environmentally friendly, stable and durable.
Paint
The logs are first stained manually, and then treated with odor-neutralizing varnish to ensure the product's water resistance and stability.
Kind tips:
The table is interchangeable left and right.
Material
The main material is North American ASH class (FSC®grade)
(top quality) FSC certified, with a beautiful pattern
An additional material is paulownia wood, which is used only for the inner panel of the drawer. (for some products)
Corrosion resistance, wear resistance, high temperature resistance, no deformation
Our furniture is 100%
FSC®-certified wood from forests that are responsibly managed to be environmentally sound and socially beneficial
By choosing FSC®-certified furniture, you are supporting responsible management of the world's forests.
The whole product is made up of 100% pure solid wood, -without any artificial boards, -without veneer, -without spliced boards, all natural.
North American Ash, grade FAS, with a rough texture, toughness and elasticity, with high corrosion resistance.
Strong stability.
FAS grade is a high-quality grade specified by the American Timber Association,
which is two pieces of wood near the bottom.
The quality is particularly outstanding.
Clearly visible pith rays make the wood dense and beautiful in texture
among the North American origins, the Pennsylvania region on the northern slope of the Appalachian Mountains is better.
_____
The ash is finished with our nourishing natural vegetable wood wax oil
botanical formula, from soybean oil,
which protects the timbers and reveals it's natural texture

FAQ
Shipping, Returns & Protection
Shipping
Worldwide Delivery: You will receive your order within 5-6 weeks.
Convenient Delivery: The order will be delivered to your doorstep.
Free Shipping: Free shipping is available on all orders!
Taxes and Duties Included: All taxes and customs fees are included in the price.
Processing Fee
A 7% processing fee will be applied at checkout to cover order handling and fulfillment.
- Items marked as "USA DELIVERY 2-7 DAYS" will reach you within a few days.
____
Returns
Damaged Items: If your furniture arrives damaged (less than 1% of cases), we will pick it up and issue a full refund immediately.
Change of Mind: If you decide to return your order for any reason, you may do so within 30 days of receiving your order. In this case, you will need to cover the cost of return shipping to our office in Miami.
____
It's Safe
Protected by U.S. Consumer Laws: When you purchase from our company, registered in the U.S., your transaction is fully protected by U.S. consumer protection laws. These laws ensure fair practices, clear terms, and your right to refunds or replacements in case of any issues.
Why You'll Love It
Our furniture is crafted from 100% premium solid wood by the No. 1 residential furniture manufacturer in China, a leader in the industry known for its exceptional craftsmanship and unmatched quality. By sourcing directly from the factory, we ensure you receive high-quality, durable furniture at the most affordable prices.
Assembly Made Easy:
Most of our furniture arrives fully assembled, requiring only minimal effort to attach the legs. This applies to everything except wardrobes wider than 32 inches (80 cm) and beds, which may require simple assembly for easier shipping and handling.
Here’s how we keep costs low while maintaining superior quality:
Factory-Direct Shipping: Your order is delivered straight from the factory to your doorstep, eliminating multiple middlemen.
No Retail Markups: We skip traditional retail channels, saving you from paying inflated prices.
Marketplace Fees Avoided: Unlike many sellers on third-party platforms, we avoid extra listing and transaction fees, keeping costs transparent.
Streamlined Logistics: With a high volume of orders, we achieve significant savings in shipping and handling, which are passed on to you.
No Warehouse Costs: By shipping directly, we bypass expensive warehouse storage fees.
The result? Luxury solid wood furniture with timeless design and outstanding durability, offered at prices you won’t find elsewhere.
Product Electrical Compatibility
For furniture items equipped with lighting, all included plugs will feature a Type A plug, which is fully compatible with electrical outlets in the USA and Canada.
If you're purchasing this product for use in the United Kingdom or other countries with different outlet types, your order will include a simple adapter, ensuring full compatibility with local power outlets. No additional adjustments are needed—just plug it in and enjoy!
This solution ensures that our furniture with built-in lighting is convenient, safe, and ready for use anywhere in the world.
Dieses Produkt hat noch keine Bewertungen.















